Saturday, April 7, 2007
Friday, March 30, 2007
Update
The second bedroom door - needs carpinters attention to close properly
the kitchen contra-piso takes shape / the door to the toilet
looking into the toilet room, and out from the bathroom
having removed the kitchen window / looking into the bathroom with door resting against wall
more of the contra-piso before laying the “carpeta”on which the reclaimed parquet will sit.
Wednesday, March 21, 2007
Plumbing and gas
Some exterior walls are of a concrete mix, not brick, as seen above.
Plumbing using Aquasistem for the shower and bathroom sink.
Bathroom and kitchen replumbing amidst the excavated floors
New kitchen water pipes, and gas pipes navigating obtsacles in the form of important water pipes integral to the building.
Gas pipe connections now meet satery standards.
The future kitchen island, awaiting the mastery of the carpinters work to transform this into the central feature of the kitchen.
Thursday, March 15, 2007
Designs
Monday, February 26, 2007
Walls go up
A new wall goes up, to create the main bathroom and define the kitchen
looking towards the new bathroom entrance, and within the bathroom looking to the window
removing the old pine floors from the once passageway and the bricked up passage entrance
removing the “moulduras” from the walls and the kitchen floor before preparation
Saturday, February 17, 2007
Work begins
Monday, February 12, 2007
A new life for an old apartment
This apartment’s Australian owners spent many years coming to Buenos Aires for pleasure and business, before finally buying a quiet 2 bedroom apartment in a beautiful french style building located the heart of San Telmo.
Redevelopers modified this apartment by removing many dividing walls and passageways to create an open plan apartment with an american style kitchen, large bathroom, and expansive living room with larger windows and classic parquet floors.
Inside the apartment, as it was in 2006