Floors have been darkened in color to provide more even appearance between original and newly laid floor
Installed and ready for the bathroom to be cleaned
The bedroom floors, sanded and hydrolaquered
Bedroom 1 Bedroom 2
New living room floor looking towards kitchen (L) and the entrance (R)
Painting continues, lights installed
Bathroom fittings installed
New window frames painted, awaiting glass
a balcony railing (shown upside down) awaits fitting
New windows take form on the rear balcony
and another change takes place with new window in the kitchen
The bedrooms get their first coat of color
the bathroom floor takes form
new photos showing the progress of tiling and wall preparation for painting
The kitchen ceiling being created
The balcony is prepared for the new windows
The tiling of the bathroom begins
Dust obscures the views as walls are prepared for painting